
Make an existing mold your own.
Begin with a proven bottle platform, then tailor the decoration, cap, pump, color, logo treatment and outer packaging. A new appearance does not always require a new bottle mold.
Packaging for Good. Designed for Growth.
A shape becomes real.
The engineering begins earlier.

An original bottle shape can define a fragrance. The right development route starts with knowing which parts of the package need to change.

Begin with a proven bottle platform, then tailor the decoration, cap, pump, color, logo treatment and outer packaging. A new appearance does not always require a new bottle mold.

Adapt selected elements of an existing packaging direction to create a more tailored silhouette, finish or component combination. Structural changes are reviewed for feasibility and tooling implications.

Create a bottle architecture from the ground up when your hero product calls for a more distinctive form. Engineering, prototypes and trial samples establish the route to repeatable production.
We assess the bottle, components and finish together before recommending investment in new tooling.
Confirm feasibility ↗Move through clear approval gates. Each stage gives the next decision a physical or technical foundation.
The development schedule follows the design, material, sampling plan and required revisions. Project timing is confirmed after the technical brief is reviewed.
Review your starting point ↗A silhouette is only the beginning. Review the structural details that connect your design to the mold, the closure and the production line.
Tooling and molding are connected, but different. The right tool is designed around the material, the part and the forming process.

The mold and related production tooling translate the approved design into equipment capable of producing the required geometry.
Production uses that tooling to shape the selected material. Trials establish whether the process can reproduce the intended result.
PET containers commonly use injection stretch blow molding: a preform is produced, then reheated, stretched and blown to the bottle shape.
Plastic components such as selected caps and collars are injection molded. PE and PP containers may use blow-molding processes appropriate to their design.
A useful quotation begins with a clear design and production brief. Explore the decisions behind the investment.
Form approval is one milestone. Production approval considers the bottle, functional components, finish and packing as a complete system.
Plan your sample review ↗
Connect bottle development with the components, decoration and packaging that complete the fragrance. Resolve dependencies together, while the design can still evolve.



Confirm ownership and use rights, storage and custody, maintenance, repair, trial scope and future production arrangements in the project agreement. A private mold does not, by itself, define every intellectual property or exclusivity right.
The right answer starts with the intended bottle and its production plan.
Not always. An existing bottle can be differentiated through decoration, closures and outer packaging. A private mold becomes relevant when a new bottle structure or silhouette is central to the design.
Share a drawing, concept or reference with the target capacity, material, quantity, timing and key components. Identify the visual details that must be preserved and any target cost constraints.
No. A form prototype helps evaluate size, proportion and handling. Trial samples in the intended production material are needed to assess the relevant appearance and functional requirements.
Timing depends on design complexity, material, tooling, sample approvals and revisions. The project schedule is confirmed after feasibility review; sample and production lead times should be agreed separately.
Yes. Reviewing these elements alongside the bottle helps identify fit, assembly and finish requirements before the design and tooling are approved.
Ownership, permitted use, exclusivity, custody and maintenance are defined by the written project agreement. Confirm the repair and replacement arrangements, as well as the plan for future production.